Home
About
Profile
Qualification
3D Factory
Products
Vibroflot
Multifunctional pile machine
Control System
Depth Vibrator mounted on excavator
Insruction
Vibration technology
Mechanism and effect of Vibro
Range of application
Vibroflot structure and model selection
Design of vibroflotation
Execution of vibro
Quality control
Depth Vibrator hoisting equipment
Cases
Water conservancy and hydropower
Port terminal
Petrochemical
Thermal power and nuclear power
City buildings
Municipal Engineering
Railway and highway
Methods
New Arrival
Blog
Contact Us
yangx@bjvibro.com
Language
English
Chinese
Construction of three ship locks in Beijing's sub-center begins
As an important hub for waterway transportation, the Yulinzhuang and Gantang locks on the Beijing-Hangzhou Grand Canal section in Tongzhou have entered the full construction stage, and the Yangwa lock has entered the survey and design stage. It is expected that all sections will be navigable by June next year!
The foundation treatment project of the Daduhe Hard Liangbao Hydropower Station's headworks
The CI-2 section of the foundation treatment construction for the Daduhe Hard Liangbao Hydropower Station project is located on the Daduhe River in Lengqi Town, Luding County, Ganzi Tibetan Autonomous Prefecture, Sichuan Province. It is the 14th power station in the newly planned 28-level scheme for the Daduhe River in Sichuan Province, upstream of the Luding Hydropower Station, and downstream it connects with the Dagangshan Hydropower Station.
Beijing Zhenchong Engineering Machinery assists in the foundation treatment project of the key water diversion irrigation project in Dabie Mountain revolutionary base area, Henan Province
The Da Bieshan Revolutionary Old Area in Henan Province's water diversion project from the Huai River for irrigation is a major project under the National 13th Five-Year Plan and one of the first ten water conservancy projects promoted by Henan Province in its implementation of the "Four Rivers Management" policy. The project mainly includes three parts: the Xixian hub project, the urban water supply project, and the irrigation area backbone project.
The Bay Dragon Back Fish Pond revetment vibratory stone column reinforcement project has been successfully completed.
On July 4, 2022, the vibro-stone column reinforcement project (below 305-meter elevation) and the plastic concrete seepage-preventing wall project of the Bay Longbei fish pond revetment, undertaken by Beijing Zhenchong Engineering Machinery Co., Ltd., were successfully completed.
Beijing Vibrating Compaction Engineering Machinery | Caodian Rubber Dam Vibration Compaction Stone Column Project, North Canal Xianghe Section
The Caodian rubber dam vibratory stone column construction project on the Xianghe section of the Beiyun River is being constructed by Beijing Vibratory Engineering Machinery Co., Ltd. The Beiyun River section, starting from the Beijing-Hebei border in the north and extending south to the Caodian rubber dam, has a design stake number of Z0+000~Z8+200, approximately 8.2km in length. The second phase of the project involves dredging, excavation, and bank protection of the river channel from stake number Z2+500 to Z8+200. This area belongs to a fluvial alluvial plain with a uniform topography. The elevation of the exploration points ranges from 4.19m to 14.84m. The groundwater in this area is mainly Quaternary pore water. The measured stable groundwater level depth in the project area is 2.00~5.90m, with a corresponding elevation of 8.55~9.20m. The environmental water has weak sulfate corrosion on concrete; and weak corrosion on steel bars in reinforced concrete structures.
Vibration stone column project in Mixigou, Wanzhou District, Chongqing
The Mixigou to Changjiang Fourth Bridge drawdown area comprehensive improvement project in Wanzhou District, Chongqing Municipality is located in Chenjiaba Street, Wanzhou District. The project mainly includes 3707 meters of reservoir bank improvement, 3955 meters of road construction, 2260 meters of landslide treatment, and 607469 square meters of landscape greening.
Hydropower project
Project Name: Hebei Fengning Hydropower Plant Foundation Treatment Construction Duration: 2016 Treatment Depth: 25m Total Project Volume: 400,000 linear meters Project Name: Yunnan Pudinghe Luji Hydropower Station Hub Project Construction Duration: 2010 Treatment Depth: 18m Total Project Volume: 500,000 linear meters
water conservancy project
Project Name: Sichuan Shimian Tianwan River Hydraulic Hub Dam Rubble Pile Engineering Construction Year: 2005 Treatment Depth: 25m Total Engineering Quantity: 450,000 linear meters Project Name: Hadas Mountain Hydraulic Hub Dam Foundation Vibro-compaction Reinforcement Construction Year: 2009 Treatment Depth: 15m Total Engineering Quantity: 550,000 linear meters Project Name: Yunnan Dazhuang Dam Vibro-compaction Engineering Construction Year: 2003 Treatment Depth: 18m Total Engineering Quantity: 400,000 linear meters