Home
About
Profile
Qualification
3D Factory
Products
Vibroflot
Multifunctional pile machine
Control System
Depth Vibrator mounted on excavator
Insruction
Vibration technology
Mechanism and effect of Vibro
Range of application
Vibroflot structure and model selection
Design of vibroflotation
Execution of vibro
Quality control
Depth Vibrator hoisting equipment
Cases
Water conservancy and hydropower
Port terminal
Petrochemical
Thermal power and nuclear power
City buildings
Municipal Engineering
Railway and highway
Methods
New Arrival
Blog
Contact Us
yangx@bjvibro.com
Language
English
Chinese
The vibratory stone column construction project for the expansion of crude oil storage tanks in the Yingkou City Bayuquan Development Zone has achieved a phased victory.
Huajin Shares' transportation subsidiary's 2 x 100,000㎡ crude oil tank expansion project. This project is general contracted by China Petroleum Pipeline Bureau Engineering Co., Ltd., with design by Huajin Wuzhou Chemical Engineering Design Co., Ltd. The foundation treatment uses vibro-compaction stone column method.
Beijing Zhenchong Engineering Machinery | Pile foundation project of Maoming Beishanling crude oil commercial reserve base
In accordance with the national requirements for accelerating the construction of crude oil reserve facilities and the arrangements and deployments of Sinopec Group Co., Ltd.,
Beijing Zhenchong Engineering Machinery | Yanzi Pipeline Capacity Expansion and Transformation Project, Changyi Oil Depot Vibro-stone Column Project
The proposed expansion and renovation project of the Yanzi pipeline Changyi oil depot is located in Changyi City, Weifang City, Shandong Province. In this project, Beijing Zhendong Engineering Machinery Co., Ltd. (Zhendong Machinery), based on the project characteristics, combined with its organizational and application advantages in geotechnical engineering technology, and the successful experience accumulated in the field of vibration compaction construction, organized the strongest and most efficient personnel, invested in the best quality equipment, adopted reasonable and advanced construction processes to ensure the construction quality and construction period; through standardized and standardized management means, to achieve full-staff, full-process, all-round, and all-weather control of processes and processes, ensuring construction quality. The north side of the construction site is about 400m away from Hanxing Road, the east side is about 400m away from Anlixing Avenue, the south side is adjacent to Mingsheng Road, and the west side is about 200m away from Xuanhe River. The transportation is convenient, and the geographical location is excellent. The planned buildings and structures include 1 35KV substation, 1 200m³ pressure relief tank foundation, 1 single-story process equipment area, and 1 single-story oil pumping shed, with a total construction area of about 2000㎡. The planned site is flat and open, with the maximum elevation of the drilling point at 3.91m and the minimum elevation at 2.86m, with a relative elevation difference of 1.05m. The geomorphological type belongs to the alluvial-proluvial plain geomorphology. There is backfilled crushed stone soil in the surface layer of some areas of the site, with a backfilling thickness of about 10cm. In most areas, the surface layer is layered fill soil, under which is silty fine sand, medium sand, silty soil, medium sand, and silty clay. According to the characteristics of the strata and design requirements of the construction area of this project, the length of the vibration compaction pile for the Yanzi pipeline expansion and renovation project Changyi oil depot is 9 meters, the pile diameter is 800mm, and the pile spacing is 1.6-2.0m. A total of about 10318.5 linear meters. The 130KW vibration compactor produced by our company is selected as the main construction equipment.
Petrochemical project
Project Name: Jidong Oilfield No. 1, 2, and 3 Artificial Island Foundation Treatment Project Construction Year: 2008 Treatment Depth: 15m Total Project Volume: 450,000 linear meters Project Name: Bayuquan Port Terminal Foundation Engineering Construction Year: 2010 Treatment Depth: 18m Total Project Volume: 200,000 linear meters Project Name: Caofeidian Crude Oil Terminal and Supporting Facilities No. 1 and 6 Tank Project Construction Year: 2005 Treatment Depth: 30m Total Project Volume: 100,000 linear meters