Vibration compaction equipment is used in the foundation treatment project of the first-level node of the Dadu River Yingliangbao Hydropower Station
Published Time:
2021-03-03
The CI-2 section of the Daduhe Hardliangbao Hydropower Station project's upstream diversion structure foundation treatment is located on the Daduhe River mainstream in Lengqi Town, Luding County, Ganzi Tibetan Autonomous Prefecture, Sichuan Province. It is the 14th power station in the latest planned 28-level scheme for the Daduhe River mainstream in Sichuan Province, upstream of the Luding Hydropower Station, and downstream it connects with the Dagangshan Hydropower Station.
The upstream diversion structure adopts a layout of "lateral water intake and forward sand flushing discharge", consisting of a dam, water discharge and sand flushing structures, intake, power generation structures, fish passage structures, and water conveyance structures.
The upstream diversion structure's vibroflotation stone column project mainly treats the foundation of the concrete dam. The right bank面板堆石坝 uses a foundation treatment scheme combining vibroflotation stone columns and weighting. Vibroflotation stone columns are used to treat the sand layer downstream of the面板堆石坝 foundation, arranged in a square pattern. Vibroflotation stone columns are also used to treat areas near the toe plate, connecting plates, and cutoff wall.
The bearing capacity of the vibroflotation stone columns is not less than 850 kPa, and the modulus of deformation is not less than 50 MPa; the content of stones with a particle size less than 5 mm does not exceed 10%, the mud content does not exceed 5%, and the saturated compressive strength is greater than 80 MPa;
In the construction of this project, all vibroflotation equipment used is developed and produced by Beijing Vibroflotation Engineering Machinery Co., Ltd.