Home
About
Profile
Qualification
3D Factory
Products
Vibroflot
Multifunctional pile machine
Control System
Depth Vibrator mounted on excavator
Insruction
Vibration technology
Mechanism and effect of Vibro
Range of application
Vibroflot structure and model selection
Design of vibroflotation
Execution of vibro
Quality control
Depth Vibrator hoisting equipment
Cases
Water conservancy and hydropower
Port terminal
Petrochemical
Thermal power and nuclear power
City buildings
Municipal Engineering
Railway and highway
Methods
New Arrival
Blog
Contact Us
yangx@bjvibro.com
Language
English
Chinese
Company News
The paper "Application of Real-time Process Data in the Whole Process Quality Control of Vibro-impact Stone Columns", authored by Beijing Zhenchong Engineering Machinery, was published in the journal "Foundation Treatment" hosted by Zhejiang University.
2020-10-30
In October 2020, "Application of Real-time Process Data in the Whole Process Quality Control of Vibroflotation Stone Columns," edited by Beijing Zhenchong Engineering Machinery, was published in the journal "Ground Improvement," hosted by Zhejiang University.
Construction of the city sub-center lock started
2020-10-20
Construction of three ship locks in the city sub-center has begun.
The vibratory stone column construction project for the expansion of crude oil storage tanks in the Yingkou City Bayuquan Development Zone has achieved a phased victory.
2020-09-30
Vibration stone column project in Mixigou, Wanzhou District, Chongqing
2020-07-07
On May 21, Beijing Zhenchong Engineering Machinery Co., Ltd. officially launched the Mixigou vibro-stone pile project in Wanzhou District, Chongqing. The Zhenchong team overcame numerous difficulties, including the epidemic, complex construction environment, and the rainy season. At the project site, they strictly followed local epidemic prevention and control requirements, adopting measures such as reducing face-to-face communication, wearing masks during indoor work, and reducing personnel going out, to comprehensively ensure the safety and health of construction personnel. Project Overview: The Mixigou to Changjiang Fourth Bridge recession zone comprehensive improvement project in Wanzhou District, Chongqing is located in Chenjiaba Street, Wanzhou District, Chongqing. The project mainly includes 37...
Beijing Zhenchong Engineering Machinery | The 2020 Timor-Leste project was successfully completed, and the 2021 Fengnan Port project was officially launched. Wishing for a new year of peace and health for all, and for the flourishing development of Zhenchong's business.
2020-04-25
The Dibao Bay container terminal vibro-stone column project in East Timor was completed on December 30, 2020, at 6:30 PM, with a total of 14,027 vibro-stone columns completed. This stone column project, started in November 2019, lasted over a year. Thanks to the hard work of the vibro-stone team, it was successfully completed. We are grateful for everyone's hard work. In 2021, we will work together, continue to carry forward the vibro-stone spirit, and create even more brilliant achievements. We also celebrate the commencement of the Fengnan Port public terminal project on January 1, 2021.
Bottom discharge vibrator | Control system
Vibrator frequency control cabinet, material bin control cabinet, BJZC-CS-4P circulating water cooling control system